Projects

Owner: ASIACELL GSM Operator

Project: Asiacell GSM Operator

Project Description:
Site selection
Civil works assessment
Tower supply
Dsc 1800 installation
PDH MW installation
SDH MW installation
Installation and commissioning
Installation and activation of transmission equip-ment
Power installation

Owner: Nokia Semines Network (NSN)

Project: Zain Company (GSM)

Project Description:
Site mapping
Civil works
Tower supply with air-conditioned room for equipment
Installation and commissioning of BTS
MSC/RNC
3G BTS
SDH

1 - Site Acquisition:

Allocated more than 300 sites across various provinces of Iraq.
Activities included
Drawing maps
Site planning
Contract signing

2 - Construction Works:

Constructed more than 1,00 sites on various types of land (roof-tops, agricultural land, desert areas).
Works included:
Excavation
Concrete pouring
Erection of steel structures
Equipment installation
Electrical works, ATS, generators, alarm system